We want you to make an educated decision on a PUD

That's why we raised $13,000 to commission a Feasibility Study by a respected engineering firm with over 35 years of experience. This is not the Engineering Report that would be funded through a one-time 30 cents per 100,000 levy on accessed property value. (Measure 3-123)

View and Print the CPUD Feasibility Study [Free Acrobat Reader Required]

High-Speed Connection [view]
Dial-Up (in parts): [1]  [2]  [3]  [4]

P.U.D. Feasibility Study
by D Hittle & Associates, electrical engineers
and consultants with 35 years experience.

Source: Clackamas People’s Utility District, Preliminary Feasibility Study, D. Hittle & Associates, Inc. (page 28)