We want you to make an educated decision on a PUD That's why we raised $13,000 to commission a Feasibility Study by a respected engineering firm with over 35 years of experience. This is not the Engineering Report that would be funded through a one-time 30 cents per 100,000 levy on accessed property value. (Measure 3-123) View and Print the CPUD Feasibility Study [Free Acrobat Reader Required] High-Speed Connection [view] P.U.D. Feasibility Study
Source: Clackamas People’s Utility District, Preliminary Feasibility Study, D. Hittle & Associates, Inc. (page 28)
|